October 8, 2026
Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Insights, case studies, and announcements from ProTorque.
Featured
October 8, 2026
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Latest
October 6, 2026
Every midstream operator knows the most expensive hour is the one where the facility is down and nobody planned for it. Unplanned downtime stops…
September 16, 2026
Carbon capture wells are turning into real work. Quest has been injecting north of a million tonnes a year since 2015, and more storage…
September 9, 2026
A connection can hit its final torque number and still be wrong. Cross-threading, galling, over-rotation, a shoulder that never seated properly. From the rig…
August 28, 2026
Midstream operators are expanding capacity faster than the infrastructure was built to handle. Produced water volumes are climbing, tank batteries are scaling, and existing…
August 26, 2026
The rig floor is the most expensive place to discover a connection problem. Every make-up performed there happens on the clock, with the critical…
February 25, 2026
RCD installation is a normal part of many Managed Pressure Drilling programs, but how it is handled can change both risk and cost. Traditionally,…
February 5, 2026
Vacuum drifting is a safer way to confirm casing inside diameter (ID) before running. Instead of conventional snake-and-drift handling, the drift is moved through…
January 21, 2026
On a modern rig, decisions happen fast. Crews make calls based on numbers they trust: torque values, hook load, and iron roughneck torque, at…
December 30, 2025
Casing running tools take a lot of abuse in the field. ProTorque’s CRT redress program is designed to eliminate variability between runs by returning…